Baiziwan 百子湾 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Platform | |||||||||||
| General information | |||||||||||
| Location | Guangqu Road Nanmofang, Chaoyang District, Beijing China | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line(s) | Line 7 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | December 28, 2014 | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
![]() Baiziwan Location in central Beijing | |||||||||||
Baiziwan Station (simplified Chinese: 百子湾站; traditional Chinese: 百子灣站; pinyin: Bǎizǐwān Zhàn) is a station on Line 7 of the Beijing Subway towards the southern part of the city. It was opened on December 28, 2014 as a part of the stretch between Beijing West railway station and Jiaohuachang and is located between Dajiaoting and Huagong.[1]
It is located in Chaoyang District along Guangqu Road east of the East 4th Ring Road Middle on the north side of the former Beijing Chemical Engineering 2nd Plant (北京化工二厂).[2]
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A1, A2, A3, and B. Exit A1 is accessible.
References
- ↑ "Beijing opens four new subway lines". Xinhua. Retrieved 28 December 2014.
- ↑ "北京市规划委员会关于轨道交通7号线沿线车站站名命名预案的公示书" (in Simplified Chinese). Beijing Municipal Planning Committee. 2013-08-29. Archived from the original on 2015-09-23. Retrieved 2013-10-15.
39°53′33″N 116°29′52″E / 39.89253°N 116.497768°E
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
.jpg.webp)
