| Line-I | |
|---|---|
| Overview | |
| Status | Proposed |
| Termini | |
| Stations | 20 |
| Service | |
| Type | Rapid transit |
| System | Madurai Metro |
| Technical | |
| Line length | 31 km (19 mi) |
| Number of tracks | 2 |
| Operating speed | 60 km/h (37 mph) |
The Line 1 is one of the three proposed lines of Madurai Metro and the only line which is to be implemented at the Phase 1 of Madurai Metro. The line stretches from Tirumangalam to Othakadai. The line consists of 27 stations.[1]
Stations
The stations proposed in the first phase of Madurai Metro in the Line-1 are;[2]
| S.No | Station Name | Interchange connection | Places Connected | Layout | Opened | Depot Connection | Depot Layout | |
|---|---|---|---|---|---|---|---|---|
| English | Tamil | |||||||
| 1 | Tirumangalam | திருமங்கலம் | None | Elevated | Proposed Phase 1 | Tirumangalam Depot | None | |
| 2 | Kappalur Toll Plaza | கப்பலூர் சுங்கச்சாவடி | None | None | Elevated | Proposed Phase 1 | None | None |
| 3 | Dharmathupatty | தர்மத்துப்பட்டி | None | None | Elevated | Proposed Phase 1 | None | None |
| 4 | Thoppur | தோப்பூர் | None | AIIMS Madurai | Elevated | Proposed Phase 1 | None | None |
| 5 | Thirunagar | திருநகர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 6 | Thiruparankundram | திருப்பரங்குன்றம் | Thiruparankundram Murugan Temple | Elevated | Proposed Phase 1 | None | None | |
| 7 | Pasumalai | பசுமலை | None | None | Elevated | Proposed Phase 1 | None | None |
| 8 | Vasantha Nagar | வசந்த நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 9 | Madura College | மதுரா கல்லூரி | None | None | Elevated | Proposed Phase 1 | None | None |
| 10 | Madurai Junction | மதுரை சந்திப்பு | Meenakshi Amman Temple West Tower | Underground | Proposed Phase 1 | None | None | |
| 11 | Therkuvasal | தெற்குவாசல் | None | Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal | Underground | Proposed Phase 1 | None | None |
| 12 | Keelavasal | கீழவாசல் | None | Meenakshi Amman Temple East Tower | Underground | Proposed Phase 1 | None | None |
| 13 | Simmakkal | சிம்மக்கல் | None | Simmakkal Market | Underground | Proposed Phase 1 | None | None |
| 14 | Goripalayam | கோரிப்பாளையம் | None | Government Rajaji Hospital | Underground | Proposed Phase 1 | None | None |
| 15 | City Police Commissioner Office | மாவட்ட காவல் கண்காணிப்பாளர் அலுவலகம் | None | City Police Commissioner Office | Elevated | Proposed Phase 1 | None | None |
| 16 | K.Pudur | புதூர் | None | None | Elevated | Proposed Phase 1 | None | None |
| 17 | Mattuthavani | மாட்டுத்தாவணி | Mattuthavani Integrated Market | Elevated | Proposed Phase 1 | None | None | |
| 18 | Uthangudi | உத்தங்குடி | None | None | Elevated | Proposed Phase 1 | None | None |
| 19 | High Court Bench | உயர்நீதிமன்ற கிளை | None | None | Elevated | Proposed Phase 1 | None | None |
| 20 | Othakkadai | ஒத்தக்கடை | None | None | Elevated | Proposed Phase 1 | None | None |
See also
References
- ↑ "Tender floated to prepare detailed project report for Madurai metro". Retrieved 15 April 2023.
- ↑ "Madurai metro to link airport in phase II; 5 km to be underground". Retrieved 7 April 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.