PMC Bhavan | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Pune Metro station | |||||||||||
![]() | |||||||||||
| General information | |||||||||||
| Location | Shivajinagar, Pune, Maharashtra 411005 | ||||||||||
| Coordinates | 18°31′22″N 73°51′13″E / 18.52274°N 73.85353°E | ||||||||||
| Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
| Operated by | Pune Metro | ||||||||||
| Line(s) | Aqua Line | ||||||||||
| Platforms | Side platform Platform-1 → Ruby Hall Clinic Platform-2 → Vanaz | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Platform levels | 2 | ||||||||||
| Accessible | Yes | ||||||||||
| Other information | |||||||||||
| Station code | PMC | ||||||||||
| History | |||||||||||
| Opened | 1 August 2023 | ||||||||||
| Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
PMC Bhavan is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I.[1] Currently, Aqua Line is operational between Vanaz and Ruby Hall Clinic.[2]
The station is located in front of the Pune Municipal Corporation (PMC) building.[3] Its design is inspired by wadas (house with courtyards) found in peth areas of the city.[4] In September 2023, Maha-Metro has proposed to construct a footbridge which will directly connect the PMC building to the station for easy commute of the employees as well as visitors to the former.[5]
Station layout
PMC Bhavan track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 1 Eastbound |
Towards → Ruby Hall Clinic next station is Civil Court Change at the next station for Purple Line | |
| Platform 2 Westbound |
Towards ← Vanaz next station is Chhatrapati Sambhaji Udyan | |
| Side platform | Doors will open on the left | ||
| L3 | ||
Entry/Exit
See also
References
- ↑ "PM to flag off metro trains marking inauguration of completed sections of Pune Metro". pib.gov.in. 30 July 2023. Retrieved 4 August 2023.
- ↑ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times. Retrieved 4 August 2023.
- ↑ Dastane, Sarang (29 August 2018). "Metro station to come up in front of PMC's administrative building". The Times of India. ISSN 0971-8257. Retrieved 9 September 2023.
- ↑ Nath, Dipanita (21 December 2022). "With wadas, pagdis and Dandi March, Pune Metro to offer a ride through city's culture, history". The Indian Express. ProQuest 2756572876. Retrieved 9 September 2023.
- ↑ Gadkari, Siddharth (2 September 2023). "Maha-Metro reaches out to PMC, proposes FOB to encourage facility". Hindustan Times. Retrieved 9 September 2023.
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
